[Q43-Q58] Ensure Success With Updated Verified RCDDv14 Exam Dumps [2023]

Share

Ensure Success With Updated Verified RCDDv14 Exam Dumps [2023]

Exam Materials for You to Prepare & Pass RCDDv14 Exam.


BICSI RCDDv14 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Produce ICT close-out documentation for the owner to provide the record documentation of the installation
Topic 2
  • Design ICT telecommunication spaces to ensure standards compliance and
  • or client requirements are met
Topic 3
  • Assess ICT current conditions as required to determine design solutions by conducting a site survey and reviewing record documentation
Topic 4
  • Calculate (size) ICT premise backbone pathways to ensure standards and code compliance and
  • or client requirements are met
Topic 5
  • Review ICT close-out documentation with the owner to ensure it is accurate and complete
Topic 6
  • Participate in additional bid
  • tender activities (i.e., bidders’ conference, meetings, site walks) as required

 

NEW QUESTION 43
The program manager of a multinational program must reconcile data including subject matter experts* labor hour estimates and other direct resource hour estimates. In addition the program manager must prepare the cash flow analysis Which of the following should be considered to get a baseline budget?

  • A. Currency exchange rates
  • B. Component cost estimates
  • C. Program payment schedules
  • D. Baseline schedule

Answer: A

 

NEW QUESTION 44
The marketing department of a firm has tasked the organization to design a structured cabling system allowing them to support either 10G6aseT or HDBASE-T. The budget requires that only one cable type be installed and that it be MINIMUM compliant. Of the following choices, what is the choice with the MINIMUM solution/solutions for the client?

  • A. Category 5e
  • B. Category 6A
  • C. Category 7
  • D. Category 6

Answer: B

 

NEW QUESTION 45
The program manager leads a medical billing system integration program for company A.
A health services provider Company A acquires smaller company X.
Which delivers health services strategically aligned with company A Company X uses a different billing approach than company A. Company A's chief information officer (CIO) seeks counsel on which solution would be the better option moving forward requesting the program manager's assistance.
How should the program manager respond to the ClO's request1?

  • A. Document the resources required to implement the recommended solution and demonstrate how this solution will save the company money
  • B. Gather the costs and benefits associated with each option and recommend the appropriate solution defining why the selected approach is better
  • C. Find similar examples of the preferred approach and ask the project teams to document why the preferred approach is better
  • D. Conduct a thorough stakeholder analysis and develop a program management plan to implement the appropriate solution for both companies.

Answer: B

 

NEW QUESTION 46
XYZ Company hires you to make its transitioning procedure more effective in meeting close-out requirements. You review XYZ's transitioning procedures to eliminate any that do not belong in the close-out phase.
Which of the following procedures should you removed?

  • A. Managing any required transition to operations
  • B. Managing the transition from the "As-ls" state to the "To-Be" or Target Stale
  • C. Reviewing the status of benefits with the stakeholders and program sponsor
  • D. Documenting lessons learned in the organizational database

Answer: B

 

NEW QUESTION 47
To accommodate telephone, data, CATV, security and multimedia, a MINIMUM of ________ strands of optical fiber auxiliary disconnect outlet (ADO) cable should be provided.

  • A. Six
  • B. Four
  • C. Two
  • D. Eight
  • E. Five

Answer: B

 

NEW QUESTION 48
A program is in its execution phase when a component project manager suggests a potential change that could increase the financial benefit of the program. The program manager is hesitant to submit a change request, as it would extend the program schedule and require a scope change.
To whom should the change request be presented?

  • A. The protect governance board
  • B. The program management office (PMO)
  • C. The program governance board
  • D. The program customer

Answer: C

 

NEW QUESTION 49
When considering pathway types, the ICT distribution designer should consider the applicable MICE factors as defined in TIA 568 for structured cabling systems and components MICE 3 relates to

  • A. commercial environment
  • B. light industrial environment
  • C. heavy industrial environment
  • D. medical environment

Answer: A

 

NEW QUESTION 50
During program execution, a program manager receives feedback from an executive sponsor (hat some program stakeholders may not understand the intended benefits of the program. Which will provide the greatest value to clarify stakeholder perceptions?

  • A. Redistributing the program charter
  • B. Performing a stakeholder analysis
  • C. Redistributing the benefits management plan
  • D. Updating the stakeholder communications requirements

Answer: B

 

NEW QUESTION 51
A 3 trade size conduit is sized at

  • A. 91 mm (3 1/2 in)
  • B. 129 mm (5 in)
  • C. 103 mm (4 in)
  • D. 78 mm (3 in)

Answer: D

 

NEW QUESTION 52
In preparation for the development and submission of the program master schedule to a client, the program manager meets with (he component project manager and master program scheduler to discuss the work breakdown structure (WBS) During the meeting, the master scheduler indicates that the master program schedule should include which of the following?

  • A. Program-level activities and integrated component projects
  • B. Program benefits and all components protect activities
  • C. Program activities, component activities, and all other work
  • D. Component resources and their activity assignment/responsibility metrics

Answer: A

 

NEW QUESTION 53
In a program's definition phase a program manager in country A is assigned to expand a restaurant chain into country B.
The program manager creates the program team by identifying the required protect management resources.
Which of the following represents an initial step needed to evaluate available resources that are aligned with me program's needs''

  • A. Completing an assessment of skills and competencies
  • B. Creating a program resource management plan
  • C. Obtaining resource availability information from the functional managers
  • D. Identifying program resource requirements

Answer: D

 

NEW QUESTION 54
Which of the following is the process of limiting fire and smoke using fire-resistive barriers?

  • A. Detection
  • B. Suppression
  • C. Prevention
  • D. Compart mentation

Answer: A

 

NEW QUESTION 55
The program manager takes over a poorly performing program After a review of the documentation and interviews with the program sponsor, stakeholders and program constituents, the program manager realizes that the program is not aligned with the corporate/organizational goals. The program manager must realign the constituent protects and components to meet the program's needs What action should the program manager take to realign the program?

  • A. Develop a change request to present to the governance board, accelerate some projects, close some projects and reassign some resources
  • B. Discuss the situation with the program sponsor(s) and let the sponsor(s) make the decision as to which projects to accelerate and which to close
  • C. Discuss the situation with the program stakeholders and let them decide which projects to accelerate and which to close
  • D. Assess the program schedule and determine how to maintain all projects and components within the program

Answer: B

 

NEW QUESTION 56
An ICT distribution designer is representing a client during a project execution. What is the designer's role in the Vendor and Contractor Coordination?

  • A. lf specific questions arise regarding coordination of the installation with structural, architectural, and site conditions and work between trades, submit RFIs to the GC with appropriate documentation to demonstrate the concern along with the proposed installation.
  • B. Holds two critical meetings to begin the project and allow all parties to introduce themselves The first meeting usually is conducted with the owner and design team, and the second meeting is with the field personnel and subcontractors
  • C. Oversee the sequence of the work and ensure that the job proceeds as anticipated in accordance with the project execution schedule
  • D. Synchronizes the daily activities of all trades through daily or weekly meetings (depending on project size, complexity, or criticality) with individual trade PMs. Fore people, supervisors and designers as necessary

Answer: A

 

NEW QUESTION 57
A new component project is approved by the program governance board. The funding for this component project will be provided by an organization different from the organization funding the program Would this be an acceptable funding arrangement?

  • A. Yes, the program and its components may have different funding sources
  • B. No. component projects must be funded by program funds
  • C. No. the program and the project must be funded by the same organization
  • D. Yes, only component projects may have different funding sources

Answer: A

 