NACE-CIP2-001 exam is the level 2 certification for coating inspectors. The level 2 certification requires the candidate to have at least two years of experience in coatings inspection and a good understanding of the coating industry. NACE-CIP2-001 exam covers a broad range of topics, including surface preparation, coating application, coating inspection, and coating failure analysis. Coating Inspector Level 2 certification is designed to ensure that coating inspectors have the knowledge and skills needed to perform their job effectively.
NACE-CIP2-001 certification exam is recognized as a benchmark for excellence in the coating inspection industry. Coating Inspector Level 2 certification is highly valued by employers and clients alike, as it demonstrates that the individual has the knowledge, skills, and abilities required to perform quality inspections of coatings. Coating Inspector Level 2 certification also provides individuals with a competitive edge in the job market, as it sets them apart from others who do not have the certification.
NEW QUESTION # 21
The main reason dehumidification is used during coating operations is to
- A. reduce the possibility of missing the recoat window.
- B. control the environment
- C. avoid repetitive blasting/coating operations.
- D. allow the contractor to guarantee the completion date.
Answer: B
NEW QUESTION # 22
When performing an adhesion test in accordance with ASTM D 3359 where the Dry Film Thickness is approximately 10 mils, the Inspector should use:
- A. Method B - Cross Hatch
- B. Method A - Cross Hatch
- C. Method A - X Cut
- D. Method B - X cut
Answer: C
NEW QUESTION # 23
The best choice of instrument for holiday testing of thick film concrete coatings is:
- A. High Voltage DC Pulse Type
- B. Low Voltage Sponge Type
- C. High Voltage AC
- D. High Voltage DC Constant Current
Answer: D
NEW QUESTION # 24
Differences in technique for abrasive blasting concrete versus steel require the operator to:
- A. a), b) and c)
- B. Move the nozzle quicker
- C. Increase the standoff distance
- D. Lower the blast pressure
Answer: A
NEW QUESTION # 25
A failure caused by applying a coating too thinly is known as
- A. pinholes.
- B. cracking.
- C. failure to cure.
- D. chalking.
Answer: A
NEW QUESTION # 26
When performing a hardness test on a coating which has elastic properties the inspector is likely to likely to observe:
- A. Cold flow or creep
- B. A very high reading
- C. A very low reading
- D. No difference from any other coating
Answer: A
NEW QUESTION # 27
The Inspectors' goal at the Pre-Job Conference is to:
- A. Take accurate meeting minutes for distribution
- B. Obtain a clear understanding of the Specification
- C. Discuss contractual requirements
- D. Manage the meeting so it doesn't go off topic
Answer: B
NEW QUESTION # 28
You are the NACE Level 2 inspector reviewing the documentation from a NACE Level 1 you notice significant documentation errors.
Your FIRST preferred course of action is to:
- A. Correct the errors yourself and advise your supervisor that the Level 1 Inspector is incompetent
- B. Have the Level 1 Inspector correct the errors and set up remedial training to improve the quality of documentation
- C. Correct the errors yourself and suggest the Level 1 inspector be replaced
- D. Correct the errors yourself and submit the reports without any further action
Answer: B
NEW QUESTION # 29
NACE/SSPC Water Jetting standards are directly equivalent to ISO Abrasive Blast Standards:
- A. False
- B. True
Answer: A
NEW QUESTION # 30
Inspector reports should always be copied to:
- A. Whomever the Owner identifies
- B. The Contractor and Owner
- C. All parties involved in the project
- D. The Owner only
Answer: A
NEW QUESTION # 31
Coating Surveys are legally required:
- A. On water tanks and potable water pipelines
- B. On food and beverage vessels and can linings
- C. On high pressure gas lines and fireproofed structures
- D. On commercial marine vessels and offshore platforms
Answer: D
NEW QUESTION # 32
Which concrete smoothing technique involves scrubbing a mixture of cement mortar over the concrete surface using ai cement sack, gunny sack, or sponge rubber float?
- A. High-pressure water washing
- B. Sacking
- C. Stoning
- D. Acid etching
Answer: B
NEW QUESTION # 33
You are the NACE Level 2 Inspector with the final responsibility to prepare the final report for a very large structural steel shop project which has gone very well. It is due next week. The work has been ongoing for two years and several NACE Level 1 Inspectors have worked under your supervision throughout the project. You find you are missing one week of daily reports for the night shift from the very beginning of the project and despite your best efforts they are cannot found.
You FIRST preferred course of action is to:
- A. Re-create the reports as not much was going on during night shift anyway
- B. Use creative writing to cover over the fact they are missing
- C. Plainly state in your report that they are missing
- D. Do not complete your report until they can be found
Answer: C
NEW QUESTION # 34
Which product, when closely inspected has a green or red layer of fusion bonded epoxy (FBE) that is visible directly on the steel?
- A. 3-Layer Polyethylene (PE)
- B. Fusion Bonded Epoxy
- C. 2-Layer Polyethylene (PE)
- D. Coal Tar Enamel
Answer: A
NEW QUESTION # 35
You are NACE Level 2 Inspector working on a tank lining job where a mobile centrifugal blast unit is being used to blast the tank floor to a NACE No.1/SSPC SP 5. The Contractor has completed his final blast and has called for a hold point inspection. This is the 1 st time you have seen field based centrifugal blast cleaning. You observe what appears to be staining on the substrate however the Contractor assures you this is normal when using centrifugal blast units and what you are seeing is what is defined in the standard as an acceptable variation in appearance.
Your FIRST preferred course of action is to:
- A. Shut the job down
- B. Request that the Contractor re-blast the floor
- C. Review the standard with the Contractor and re-inspect the floor
- D. Call your supervisor
Answer: C
NEW QUESTION # 36
The primary purpose of Fireproofing coatings are to provide:
- A. Temporary protection for the structure
- B. Preferential fuel for the fire
- C. Explosion resistance
- D. fire extinguishing characteristics
Answer: A
NEW QUESTION # 37
Surface preparation of concrete is performed using:
- A. Methods that are the same as wood
- B. Methods that are exactly the same as steel
- C. Methods that have been modified for concrete
- D. Methods that are completely different to steel
Answer: C
NEW QUESTION # 38
When completing the Final Inspection report the Inspector should write the report using:
- A. Language that the most would understand
- B. Language that another NACE Inspector would understand
- C. Language that only in the project would understand
- D. Language that only technical experts would understand
Answer: A
NEW QUESTION # 39
When observing design defects the NACE Inspector should:
- A. Request that the item be rebuilt with a better design for coating
- B. Stop the job immediately
- C. Ignore the defect as the inspector can't change the design
- D. Document the defect and the potential problems that could result
Answer: D
NEW QUESTION # 40
You are a NACE Level 2 in-house inspector working in a shop. Your in-house requires you to perform a sleeve test to test for soluble salts; however the 3 rd party NACE Level 3 inspector, the owner, has a san smart meter and has achieved a very different result and has rejected the pre-cleaning.
Your FIRST course of action is to:
- A. Review the specification with the other inspector to see what method was specified
- B. Advise the other inspector he is using an incorrect method
- C. Redo the pre-cleaning based on the other inspectors results
- D. Advise your QC Manager to change the ITP to the use of the salt smart meter
Answer: A
NEW QUESTION # 41
......
The Coating Inspector Level 2 certification exam is designed to evaluate a candidate's ability to identify and evaluate corrosion, surface preparation, and coating application processes. NACE-CIP2-001 exam covers various topics such as industry standards, safety regulations, coating types, and inspection methods. Passing the NACE-CIP2-001 exam demonstrates that the candidate has the knowledge and skills required to perform coating inspections and ensure that the coating systems are properly applied to protect against corrosion. It is an essential certification for individuals who work in the coating industry, including coating inspectors, engineers, and supervisors.