CTFL_Syll_4.0 100% Pass Guaranteed Download ISTQB Foundation Level Exam PDF Q&A
CTFL_Syll_4.0 Practice Test Dumps with 100% Passing Guarantee
NEW QUESTION # 12
The tests at the bottom layer of the test pyramid:
- A. are defined as 'Ul Tests' or 'End-To-End tests' in the different models of the pyramid
- B. run faster than the tests at the top layer of the pyramid
- C. cover larger pieces of functionalities than the tests at the top layer of the pyramid
- D. are unscripted tests produced by experience-based test techniques
Answer: B
Explanation:
The tests at the bottom layer of the test pyramid run faster than the tests at the top layer of the pyramid because they are more focused, isolated, and atomic. They usually test individual units or components of the software system, such as classes, methods, or functions. They are also easier to maintain and execute, as they have fewer dependencies and interactions with other parts of the system. The tests at the top layer of the test pyramid, on the other hand, are slower because they cover larger pieces of functionalities, such as user interfaces, workflows, or end-to-end scenarios. They also have more dependencies and interactions with other systems, such as databases, networks, or external services. They are more complex and costly to maintain and execute, as they require more setup and teardown procedures, test data, and test environments. Reference: ISTQB Certified Tester Foundation Level (CTFL) v4.0 sources and documents:
ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 3.2.1, Test Pyramid1 ISTQB® Glossary of Testing Terms v4.0, Test Pyramid2
NEW QUESTION # 13
Which of the following statements about exploratory testing is true?
- A. When exploratory testing is conducted following a session-based approach, the issues detected by the testers can be documented in session sheets
- B. Exploratory testing is an experience-based test technique in which testers explore the requirements specification to detect non testable requirements
- C. Exploratory testing is an experience-based test technique used by testers during informal code reviews to find defects by exploring the source code
- D. In exploratory testing, testers usually produce scripted tests and establish bidirectional traceability between these tests and the items of the test basis
Answer: A
Explanation:
Exploratory testing is an experience-based test technique in which testers dynamically design and execute tests based on their knowledge, intuition, and learning of the software system, without following predefined test scripts or test cases. Exploratory testing can be conducted following a session-based approach, which is a structured way of managing and measuring exploratory testing. In a session-based approach, the testers perform uninterrupted test sessions, usually lasting between 60 and 120 minutes, with a specific charter or goal, and document the issues detected, the test coverage achieved, and the time spent in session sheets. Session sheets are records of the test activities, results, and observations during a test session, which can be used for reporting, debriefing, and learning purposes. The other statements are false, because:
Exploratory testing is not a test technique in which testers explore the requirements specification to detect non testable requirements, but rather a test technique in which testers explore the software system to detect functional and non-functional defects, as well as to learn new information, risks, or opportunities. Non testable requirements are requirements that are ambiguous, incomplete, inconsistent, or not verifiable, which can affect the quality and effectiveness of the testing process. Non testable requirements can be detected by applying static testing techniques, such as reviews or inspections, to the requirements specification, before the software system is developed or tested.
Exploratory testing is not a test technique used by testers during informal code reviews to find defects by exploring the source code, but rather a test technique used by testers during dynamic testing to find defects by exploring the behavior and performance of the software system, without examining the source code. Informal code reviews are static testing techniques, in which the source code is analyzed by one or more reviewers, without following a formal process or using a checklist, to identify defects, violations, or improvements. Informal code reviews are usually performed by developers or peers, not by testers.
In exploratory testing, testers usually do not produce scripted tests and establish bidirectional traceability between these tests and the items of the test basis, but rather produce unscripted tests and adapt them based on the feedback and the findings of the testing process. Scripted tests are tests that are designed and documented in advance, with predefined inputs, outputs, and expected results, and are executed according to a test plan or a test procedure. Bidirectional traceability is the ability to trace both forward and backward the relationships between the items of the test basis, such as the requirements, the design, the risks, etc., and the test artifacts, such as the test cases, the test results, the defects, etc. Scripted tests and bidirectional traceability are usually associated with more formal and structured testing approaches, such as specification-based or structure-based test techniques, not with exploratory testing. Reference: ISTQB Certified Tester Foundation Level (CTFL) v4.0 sources and documents:
ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 2.2.3, Experience-based Test Design Techniques1 ISTQB® Glossary of Testing Terms v4.0, Exploratory Testing, Session-based Testing, Session Sheet, Non Testable Requirement, Static Testing, Informal Review, Dynamic Testing, Scripted Testing, Bidirectional Traceability2
NEW QUESTION # 14
A typical objective of testing is to ensure that:
- A. a software has been tested using a combination of test techniques
- B. testing is used to drive the development of a software
- C. a software has been properly covered
- D. there are no defects in a software that is about to be released
Answer: A
Explanation:
This answer is correct because a typical objective of testing is to ensure that a software has been tested using a combination of test techniques, such as black-box, white-box, or experience-based techniques, that are appropriate for the test objectives, test levels, and test types. Testing using a combination of test techniques can increase the effectiveness and efficiency of testing, as different techniques can target different aspects of the software quality, such as functionality, usability, performance, security, reliability, etc. Testing using a combination of test techniques can also reduce the risk of missing defects that could be detected by one technique but not by another. Reference: ISTQB Foundation Level Syllabus v4.0, Section 2.3.1.1, Section 2.3.2
NEW QUESTION # 15
Which of the following is a test task that usually occurs during test implementation?
- A. Archive the testware for use in future test projects
- B. Make sure the planned test environment is ready to be delivered
- C. Gather the metrics that are used to guide the test project
- D. Find, analyze, and remove the causes of the failures highlighted by the tests
Answer: B
Explanation:
A test task that usually occurs during test implementation is to make sure the planned test environment is ready to be delivered. The test environment is the hardware and software configuration on which the tests are executed, and it should be as close as possible to the production environment where the software system will operate. The test environment should be planned, prepared, and verified before the test execution, to ensure that the test conditions, the test data, the test tools, and the test interfaces are available and functional. The other options are not test tasks that usually occur during test implementation, but rather test tasks that occur during other test activities, such as:
Find, analyze, and remove the causes of the failures highlighted by the tests: This is a test task that usually occurs during test analysis and design, which is the activity of analyzing the test basis, designing the test cases, and identifying the test data. During this activity, the testers can use techniques such as root cause analysis, defect prevention, or defect analysis, to find, analyze, and remove the causes of the failures highlighted by the previous tests, and to prevent or reduce the occurrence of similar failures in the future tests.
Archive the testware for use in future test projects: This is a test task that usually occurs during test closure, which is the activity of finalizing and reporting the test results, evaluating the test process, and identifying the test improvement actions. During this activity, the testers can archive the testware, which are the test artifacts produced during the testing process, such as the test plan, the test cases, the test data, the test results, the defect reports, etc., for use in future test projects, such as regression testing, maintenance testing, or reuse testing.
Gather the metrics that are used to guide the test project: This is a test task that usually occurs during test monitoring and control, which is the activity of tracking and reviewing the test progress, status, and quality, and taking corrective actions when necessary. During this activity, the testers can gather the metrics, which are the measurements of the testing process, such as the test coverage, the defect density, the test effort, the test duration, etc., that are used to guide the test project, such as planning, estimating, scheduling, reporting, or improving the testing process. Reference: ISTQB Certified Tester Foundation Level (CTFL) v4.0 sources and documents:
ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.1, Test Planning1 ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.2, Test Monitoring and Control1 ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.3, Test Analysis and Design1 ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.4, Test Implementation1 ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.5, Test Execution1 ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.6, Test Closure1 ISTQB® Glossary of Testing Terms v4.0, Test Environment, Test Condition, Test Data, Test Tool, Test Interface, Failure, Root Cause Analysis, Defect Prevention, Defect Analysis, Testware, Regression Testing, Maintenance Testing, Reuse Testing, Test Coverage, Defect Density, Test Effort, Test Duration2
NEW QUESTION # 16
Which of the following work products cannot be examined by static analysis?
- A. Source code
- B. Compiled code
- C. Test plans
- D. Formal models
Answer: C
Explanation:
Static analysis is the process of examining the work products of a software development or testing activity without executing them. Static analysis can be applied to various types of work products, such as requirements, design, code, test cases, etc. However, test plans are not suitable for static analysis, because they are high-level documents that describe the test objectives, scope, strategy, resources, schedule, and risks of a testing project. Test plans are not executable or formalized in a way that static analysis tools can analyze them. Therefore, option A is the correct answer.
NEW QUESTION # 17
In a two-hour uninterrupted test session, performed as part of an iteration on an Agile project, a heuristic checklist was used to help the tester focus on some specific usability issues of a web application.
The unscripted tests produced by the tester's experience during such session belong to which one of the following testing quadrants?
- A. Q1
- B. Q3
- C. Q2
- D. Q4
Answer: B
Explanation:
Explanation
The unscripted tests produced by the tester's experience during the two-hour test session belong to the testing quadrant Q3. The testing quadrants are a classification of testing types based on two dimensions: the test objectives (whether the testing is focused on supporting the team or critiquing the product) and the test basis (whether the testing is based on the technology or the business). The testing quadrants are labeled as Q1, Q2, Q3, and Q4, and each quadrant represents a different testing perspective, such as unit testing, acceptance testing, usability testing, or performance testing. The testing quadrant Q3 corresponds to the testing types that have the objective of critiquing the product from the business perspective, such as exploratory testing, usability testing, user acceptance testing, alpha testing, beta testing, etc. The unscripted tests performed by the tester in the given scenario are examples of exploratory testing and usability testing, as they are based on the tester's experience, intuition, and learning of the web application, and they focus on some specific usabilityissues, such as the user interface, the user satisfaction, the user feedback, etc. The other options are incorrect, because:
The testing quadrant Q1 corresponds to the testing types that have the objective of supporting the team from the technology perspective, such as unit testing, component testing, integration testing, system testing, etc. These testing types are usually performed by developers or testers who have access to the source code, the design, the architecture, or the configuration of the software system, and they aim to verify the functionality, the quality, and the reliability of the software system at different levels of integration.
The testing quadrant Q2 corresponds to the testing types that have the objective of supporting the team from the business perspective, such as functional testing, acceptance testing, story testing, scenario testing, etc. These testing types are usually performed by testers or customers who have access to the requirements, the specifications, the user stories, or the business processes of the software system, and they aim to validate that the software system meets the expectations and the needs of the users and the stakeholders.
The testing quadrant Q4 corresponds to the testing types that have the objective of critiquing the product from the technology perspective, such as performance testing, security testing, reliability testing, compatibility testing, etc. These testing types are usually performed by testers or specialists who have access to the tools, the metrics, the standards, or the benchmarks of the software system, and they aim to evaluate the non-functional aspects of the software system, such as the efficiency, the security, the reliability, or the compatibility of the software system under different conditions or environments.
References: ISTQB Certified Tester Foundation Level (CTFL) v4.0 sources and documents:
ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 1.3.1, Testing in Software Development Lifecycles ISTQB Glossary of Testing Terms v4.0, Testing Quadrant, Exploratory Testing, Usability Testing, Unit Testing, Component Testing, Integration Testing, System Testing, Functional Testing, Acceptance Testing, Story Testing, Scenario Testing, Performance Testing, Security Testing, Reliability Testing, Compatibility Testing
NEW QUESTION # 18
The four test levels used in ISTQB syllabus are:
1. Component (unit) testing
2. Integration testing
3. System testing
4. Acceptance testing
An organization wants to do away with integration testing but otherwise follow V-model. Which of the following statements is correct?
- A. It is allowed as organizations can decide on men test levels to do depending on the context of the system under test
- B. It is not allowed because integration testing is a very important test level and ignoring i: means definite poor product quality
- C. It is not allowed as organizations can't change the test levels as these are chosen on the basis of the SDLC (software development life cycle) model
- D. It is allowed because integration testing is not an important test level arc! can be dispensed with.
Answer: C
Explanation:
The V-model is a software development life cycle model that defines four test levels that correspond to four development phases: component (unit) testing with component design, integration testing with architectural design, system testing with system requirements, and acceptance testing with user requirements. The V-model emphasizes the importance of verifying and validating each phase of development with a corresponding level of testing, and ensuring that the test objectives, test basis, and test artifacts are aligned and consistent across the test levels. Therefore, an organization that wants to follow the V-model cannot do away with integration testing, as it would break the symmetry and completeness of the V-model, and compromise the quality and reliability of the software or system under test. Integration testing is a test level that aims to test the interactions and interfaces between components or subsystems, and to detect any defects or inconsistencies that may arise from the integration of different parts of the software or system. Integration testing is essential for ensuring the functionality, performance, and compatibility of the software or system as a whole, and for identifying and resolving any integration issues early in the development process. Skipping integration testing would increase the risk of finding serious defects later in the test process, or worse, in the production environment, which would be more costly and difficult to fix, and could damage the reputation and credibility of the organization. Therefore, the correct answer is D.
The other options are incorrect because:
A) It is not allowed as organizations can decide on the test levels to do depending on the context of the system under test. While it is true that the choice and scope of test levels may vary depending on the context of the system under test, such as the size, complexity, criticality, and risk level of the system, the organization cannot simply ignore or skip a test level that is defined and required by the chosen software development life cycle model. The organization must follow the principles and guidelines of the software development life cycle model, and ensure that the test levels are consistent and coherent with the development phases. If the organization wants to have more flexibility and adaptability in choosing the test levels, it should consider using a different software development life cycle model, such as an agile or iterative model, that allows for more dynamic and incremental testing approaches.
B) It is not allowed because integration testing is not an important test level and can be dispensed with. This statement is false and misleading, as integration testing is a very important test level that cannot be dispensed with. Integration testing is vital for testing the interactions and interfaces between components or subsystems, and for ensuring the functionality, performance, and compatibility of the software or system as a whole. Integration testing can reveal defects or inconsistencies that may not be detected by component (unit) testing alone, such as interface errors, data flow errors, integration logic errors, or performance degradation. Integration testing can also help to verify and validate the architectural design and the integration strategy of the software or system, and to ensure that the software or system meets the specified and expected quality attributes, such as reliability, usability, security, and maintainability. Integration testing can also provide feedback and confidence to the developers and stakeholders about the progress and quality of the software or system development. Therefore, integration testing is a crucial and indispensable test level that should not be skipped or omitted.
C) It is not allowed because integration testing is a very important test level and ignoring it means definite poor product quality. This statement is partially true, as integration testing is a very important test level that should not be ignored, and skipping it could result in poor product quality. However, this statement is too strong and absolute, as it implies that integration testing is the only factor that determines the product quality, and that ignoring it would guarantee a poor product quality. This is not necessarily the case, as there may be other factors that affect the product quality, such as the quality of the requirements, design, code, and other test levels, the effectiveness and efficiency of the test techniques and tools, the competence and experience of the developers and testers, the availability and adequacy of the resources and environment, the management and communication of the project, and the expectations and satisfaction of the customers and users. Therefore, while integration testing is a very important test level that should not be skipped, it is not the only test level that matters, and skipping it does not necessarily mean definite poor product quality, but rather a higher risk and likelihood of poor product quality.
Reference = ISTQB Certified Tester Foundation Level Syllabus, Version 4.0, 2018, Section 2.3, pages 16-18; ISTQB Glossary of Testing Terms, Version 4.0, 2018, pages 38-39; ISTQB CTFL 4.0 - Sample Exam - Answers, Version 1.1, 2023, Question 104, page 36.
NEW QUESTION # 19
Following a risk-based testing approach you have designed 10 tests to cover a product risk with a high-risk level. You want to estimate, adopting the three-point test estimation technique, the test effort required to reduce the risk level to zero by executing those 10 tests. You made the following three initial estimates:
* most optimistic = 6 person hours
* most likely = 30 person hours
* most pessimistic = 54 person hours
Based only on the given information, which of the following answers about the three-point test estimation technique applied to this problem is true?
- A. The final estimate is between 6 person hours and 54 person hours
- B. The final estimate is exactly 30 person hours because the technique uses the initial most likely estimate as the final estimate
- C. The final estimate is between 22 person hours and 38 person hours
- D. The final estimate is exactly 30 person hours because the technique uses the arithmetic mean of the three initial estimates as the final estimate
Answer: C
Explanation:
The three-point test estimation technique is a method of estimating the test effort based on three initial estimates: the most optimistic, the most likely, and the most pessimistic. The technique uses a weighted average of these three estimates to calculate the final estimate, which is also known as the expected value. The formula for the expected value is:
Expected value = (most optimistic + 4 * most likely + most pessimistic) / 6 Using the given values, the expected value is:
Expected value = (6 + 4 * 30 + 54) / 6 Expected value = 30 person hours However, the expected value is not the only factor to consider when estimating the test effort. The technique also calculates the standard deviation, which is a measure of the variability or uncertainty of the estimates. The formula for the standard deviation is:
Standard deviation = (most pessimistic - most optimistic) / 6
Using the given values, the standard deviation is:
Standard deviation = (54 - 6) / 6 Standard deviation = 8 person hours
The standard deviation can be used to determine a range of possible values for the test effort, based on a certain level of confidence. For example, using a 68% confidence level, the range is:
Expected value ± standard deviation
Using the calculated values, the range is:
30 ± 8 person hours
Therefore, the final estimate is between 22 person hours and 38 person hours, which is option A.
NEW QUESTION # 20
Which of the following is not an example of a typical content of a test completion report for a test project?
- A. The residual risk level if a risk-based test approach was adopted
- B. The unexpected test environment downtime that resulted in slower test execution
- C. The test procedures of all test cases that have been executed
- D. The additional effort spent on test execution compared to what was planned
Answer: C
Explanation:
This answer is correct because the test procedures of all test cases that have been executed are not a typical content of a test completion report for a test project. A test completion report is a document that summarizes the test activities and results at the end of a test project. It usually includes information such as the test objectives, scope, approach, resources, schedule, results, deviations, issues, risks, lessons learned, and recommendations for improvement. The test procedures of all test cases that have been executed are part of the test documentation, but they are not relevant for the test completion report, as they do not provide a high-level overview of the test project outcomes and performance. Reference: ISTQB Foundation Level Syllabus v4.0, Section 2.5.3.2
NEW QUESTION # 21
For each of the test cases to be executed, the following table specifies the priority order and dependencies on other test cases
Which of the following test execution schedules is compatible with the logical dependencies and allows executing the test cases in priority order?
- A. TC4, TC6, TC3, TC2, TC5, TC1
- B. TC3, TC5, TC6, TC1, TC4, TC3
- C. TC4, TC3, TC2, TC6, TC1, TC5
- D. TC4, TC3, TC2, TC6, TC5. TC1
Answer: C
Explanation:
This answer is correct because it follows the logical dependencies and allows executing the test cases in priority order. TC4, TC3, and TC2 are executed first because they have the highest priority. TC6 is executed next because it has a logical dependency on TC2. TC1 is executed next because it has a logical dependency on TC5. Finally, TC5 is executed last because it has the lowest priority. Reference: ISTQB Certified Tester Foundation Level (CTFL) v4.0 documents
NEW QUESTION # 22
Who of the following has the best knowledge to decide what tests in a test project should be automated?
- A. The development manager
- B. The test leader
- C. The developer
- D. The customer
Answer: B
Explanation:
The test leader is the person who is responsible for planning, monitoring, and controlling the test activities and resources in a test project. The test leader should have the best knowledge of the test objectives, scope, risks, resources, schedule, and quality criteria. The test leader should also be aware of the test automation criteria, such as the execution frequency, the test support, the team education, the roles and responsibilities, and the devs and testers collaboration1. Based on these factors, the test leader can decide which tests are suitable for automation and which are not, and prioritize them accordingly. The test leader can also coordinate with the test automation engineers, the developers, and the stakeholders to ensure the alignment of the test automation strategy with the test project goals and expectations. Reference = ISTQB Certified Tester Foundation Level (CTFL) v4.0 Syllabus, Chapter 2, Section 2.3.1, Page 152; ISTQB Glossary of Testing Terms v4.0, Page 403; ISTQB Certified Tester Foundation Level (CTFL) v4.0 Syllabus, Chapter 6, Section 6.1.1, Page 514; Top 8 Test Automation Criteria You Need To Fulfill - QAMIND1
NEW QUESTION # 23
Can "cost" be regarded as Exit criteria?
- A. No. The financial value of product quality cannot be estimated, so it is incorrect to use cost as an exit criterion
- B. Yes. Going by cost as an exit criterion constrains the testing project which will hello achieve the desired quality level defined for the project
- C. No The cost of testing cannot be measured effectively, so it is incorrect to use cost as an exit criterion
- D. Yes. Spending too much money on test ng will result in an unprofitable product, and having cost as an exit criterion helps avoid this
Answer: D
Explanation:
Cost can be regarded as an exit criterion for testing, because it is a factor that affects the profitability and feasibility of the software product. Testing is an investment that aims to improve the quality and reliability of the software product, but it also consumes resources, such as time, money, and human effort. Therefore, testing should be planned and executed in a way that balances the cost and benefit of testing activities. Having cost as an exit criterion helps to avoid spending too much money on testing, which may result in an unprofitable product or a loss of competitive advantage. Cost can also help to prioritize and focus the testing efforts on the most critical and valuable features and functions of the software product. However, cost should not be the only exit criterion for testing, as it may not reflect the true quality and risk level of the software product. Other exit criteria, such as defect rate, test coverage, user satisfaction, etc., should also be considered and defined in the test plan.
The other options are incorrect, because they either deny the importance of cost as an exit criterion, or they make false or unrealistic assumptions about the cost of testing. Option B is incorrect, because the financial value of product quality can be estimated, for example, by using cost-benefit analysis, return on investment, or cost of quality models. Option C is incorrect, because going by cost as an exit criterion does not necessarily constrain the testing project or help achieve the desired quality level. Cost is a relative and variable factor that depends on the scope, complexity, and context of the software product and the testing project. Option D is incorrect, because the cost of testing can be measured effectively, for example, by using metrics, such as test effort, test resources, test tools, test environment, etc.
NEW QUESTION # 24
Which of the following statements best describes how configuration management supports testing?
- A. Configuration management is an administrative discipline that includes change control, which is the process of controlling the changes to identified items referred to as Configuration Items'
- B. Configuration management helps reduce testing effort by identifying a manageable number of test environment configurations in which to test the software, out of all possible configurations of the environment in which the software will be released
- C. Configuration management helps ensure that all relevant project documentation and software items are uniquely identified in all their versions and therefore can be unambiguously referenced in test documentation
- D. Configuration management is an approach to interoperability testing where tests are executed in the cloud, as the cloud can provide cost-effective access to multiple configurations of the test environments
Answer: C
Explanation:
Explanation
This answer is correct because configuration management is a process of establishing and maintaining consistency of a product's performance, functional, and physical attributes with its requirements, design, and operational information throughout its life. Configuration management helps ensure that all relevant project documentation and software items are uniquely identified in all their versions and therefore can be unambiguously referenced in test documentation. This supports testing by providing traceability, consistency, and control over the test artifacts and the software under test. References: : ISTQB Glossary of Testing Terms v4.0, : ISTQB Foundation Level Syllabus v4.0, Section 2.2.2.2
NEW QUESTION # 25
Which of the following are the phases of the ISTQB fundamental test process?
- A. Test planning and control, Test specification and design. Test implementation and execution, Evaluating test coverage and reporting, Retesting and regression testing, Test closure activities
- B. Test planning. Test specification and design. Test implementation and execution. Evaluating exit criteria and reporting. Retesting and test closure activities
- C. Test planning and control, Test analysis and design, Test implementation and execution, Evaluating ex t criteria and reporting. Test closure activities
- D. Test planning, Test analysis and design. Test implementation and control. Checking test coverage and reporting, Test closure activities
Answer: C
Explanation:
The ISTQB fundamental test process consists of five main phases, as described in the ISTQB Foundation Level Syllabus, Version 4.0, 2018, Section 2.2, page 15:
Test planning and control: This phase involves defining the test objectives, scope, strategy, resources, schedule, risks, and metrics, as well as monitoring and controlling the test activities and results throughout the test process.
Test analysis and design: This phase involves analyzing the test basis (such as requirements, specifications, or user stories) to identify test conditions (such as features, functions, or scenarios) that need to be tested, and designing test cases and test procedures (such as inputs, expected outcomes, and execution steps) to cover the test conditions. This phase also involves evaluating the testability of the test basis and the test items (such as software or system components), and selecting and implementing test techniques (such as equivalence partitioning, boundary value analysis, or state transition testing) to achieve the test objectives and optimize the test coverage and efficiency.
Test implementation and execution: This phase involves preparing the test environment (such as hardware, software, data, or tools) and testware (such as test cases, test procedures, test data, or test scripts) for test execution, and executing the test procedures or scripts according to the test plan and schedule. This phase also involves logging the outcome of test execution, comparing the actual results with the expected results, and reporting any discrepancies as incidents (such as defects, errors, or failures).
Evaluating exit criteria and reporting: This phase involves checking if the planned test activities have been completed and the exit criteria (such as quality, coverage, or risk levels) have been met, and reporting the test results and outcomes to the stakeholders. This phase also involves making recommendations for the release or acceptance decision based on the test results and outcomes, and identifying any residual risks (such as known defects or untested areas) that need to be addressed or mitigated.
Test closure activities: This phase involves finalizing and archiving the testware and test environment for future reuse, and evaluating the test process and the test project against the test objectives and the test plan. This phase also involves identifying any lessons learned and best practices, and communicating the findings and suggestions for improvement to the relevant parties.
Reference = ISTQB Certified Tester Foundation Level Syllabus, Version 4.0, 2018, Section 2.2, page 15; ISTQB Glossary of Testing Terms, Version 4.0, 2018, pages 37-38; ISTQB CTFL 4.0 - Sample Exam - Answers, Version 1.1, 2023, Question 88, page 32.
NEW QUESTION # 26
Which of the following is not an example of a typical generic skill required for testing?
- A. Possess the necessary social skills that support effective teamwork
- B. Be able to apply test-driven development
- C. Be able to use test management tools and defect tracking tools
- D. Be able to communicate defects and failures to developers as objectively as possible
Answer: B
Explanation:
Explanation
Test-driven development is not an example of a typical generic skill required for testing, but rather an example of a specific technical skill or a development practice that may or may not be relevant for testing, depending on the context and the objectives of the testing activities. Test-driven development is an approach to software development and testing, in which the developers write automated unit tests before writing the source code, and then refactor the code until the tests pass. Test-driven development can help to improve the quality, the design, and the maintainability of the code, as well as to provide fast feedback and guidance for the developers. However, test-driven development is not a skill that is generally expected or needed for testers, especially for testers who are not involved in unit testing or who do not have access to the source code. The other options are examples of typical generic skills required for testing, which are skills that are applicable and beneficial for testing in any context or situation,regardless of the specific testing techniques, tools, or methods used. The typical generic skills required for testing include:
Be able to use test management tools and defect tracking tools: These are tools that help testers to plan, organize, monitor, and control the testing activities and resources, as well as to record, track, analyze, and resolve the defects detected during testing. These tools can improve the efficiency, the effectiveness, and the communication of the testing process, as well as to provide traceability, metrics, and reports for the testing outcomes.
Be able to communicate defects and failures to developers as objectively as possible: This is a skill that involves the ability to report and describe the defects and failures found during testing in a clear, concise, accurate, and unbiased manner, using relevant information, evidence, and terminology, without making assumptions, judgments, or accusations. This skill can facilitate the collaboration, the understanding, and the resolution of the defects and failures between the testers and the developers, as well as to prevent conflicts, misunderstandings, or blame games.
Possess the necessary social skills that support effective teamwork: These are skills that involve the ability to interact, cooperate, and coordinate with other people involved in or affected by the testing activities, such as the test manager, the test team, the project manager, the developers, the customers, the users, etc. These skills can include communication, negotiation, leadership, motivation, feedback, conflict resolution, etc. These skills can enhance the quality, the productivity, and the satisfaction of the testing process, as well as to foster a positive and constructive testing culture. References: ISTQB Certified Tester Foundation Level (CTFL) v4.0 sources and documents:
ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 1.1.1, Testing and the Software Development Lifecycle ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 1.1.2, Testing and Quality ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 1.2.1, Testing Principles ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 1.2.2, Testing Policies, Strategies, and Test Approaches ISTQB Glossary of Testing Terms v4.0, Test-driven Development, Test Management Tool, Defect Tracking Tool, Defect Report, Failure, Social Skill2
NEW QUESTION # 27
Which of the following statements refers to good testing practice to be applied regardless of the chosen software development model?
- A. Tests should be written in executable format before the code is written and should act as executable specifications that drive coding
- B. Test objectives should be the same for all test levels, although the number of tests designed at various levels can vary significantly
- C. Involvement of testers in work product reviews should occur as early as possible to take advantage of the early testing principle
- D. Test levels should be defined such that the exit criteria of one level are part of the entry criteria for the next level
Answer: C
Explanation:
The statement that refers to good testing practice to be applied regardless of the chosen software development model is option D, which says that involvement of testers in work product reviews should occur as early as possible to take advantage of the early testing principle. Work product reviews are static testing techniques, in which the work products of the software development process, such as the requirements, the design, the code, the test cases, etc., are examined by one or more reviewers, with or without the author, to identify defects, violations, or improvements. Involvement of testers in work product reviews can provide various benefits for the testing process, such as improving the test quality, the test efficiency, and the test communication. The early testing principle states that testing activities should start as early as possible in the software development lifecycle, and should be performed iteratively and continuously throughout the lifecycle. Applying the early testing principle can help to prevent, detect, and remove defects at an early stage, when they are easier, cheaper, and faster to fix, as well as to reduce the risk, the cost, and the time of the testing process. The other options are not good testing practices to be applied regardless of the chosen software development model, but rather specific testing practices that may or may not be applicable or beneficial for testing, depending on the context and the objectives of the testing activities, such as:
Tests should be written in executable format before the code is written and should act as executable specifications that drive coding: This is a specific testing practice that is associated with test-driven development, which is an approach to software development and testing, in which the developers write automated unit tests before writing the source code, and then refactor the code until the tests pass. Test-driven development can help to improve the quality, the design, and the maintainability of the code, as well as to provide fast feedback and guidance for the developers. However, test-driven development is not a good testing practice to be applied regardless of the chosen software development model, as it may not be feasible, suitable, or effective for testing in some contexts or situations, such as when the requirements are unclear, unstable, or complex, when the test automation tools or skills are not available or adequate, when the testing objectives or levels are not aligned with the unit testing, etc.
Test levels should be defined such that the exit criteria of one level are part of the entry criteria for the next level: This is a specific testing practice that is associated with sequential software development models, such as the waterfall model, the V-model, or the W-model, in which the software development and testing activities are performed in a linear and sequential order, with well-defined phases, deliverables, and dependencies. Test levels are the stages of testing that correspond to the levels of integration of the software system, such as component testing, integration testing, system testing, and acceptance testing. Test levels should have clear and measurable entry criteria and exit criteria, which are the conditions that must be met before starting or finishing a test level. In sequential software development models, the exit criteria of one test level are usually part of the entry criteria for the next test level, to ensure that the software system is ready and stable for the next level of testing. However, this is not a good testing practice to be applied regardless of the chosen software development model, as it may not be relevant, flexible, or efficient for testing in some contexts or situations, such as when the software development and testing activities are performed in an iterative and incremental order, with frequent changes, feedback, and adaptations, as in agile software development models, such as Scrum, Kanban, or XP, when the test levels are not clearly defined or distinguished, or when the test levels are performed in parallel or concurrently, etc.
Test objectives should be the same for all test levels, although the number of tests designed at various levels can vary significantly: This is a specific testing practice that is associated with uniform software development models, such as the spiral model, the incremental model, or the prototyping model, in which the software development and testing activities are performed in a cyclical and repetitive manner, with similar phases, deliverables, and processes. Test objectives are the goals or the purposes of testing, which can vary depending on the test level, the test type, the test technique, the test environment, the test stakeholder, etc. Test objectives can be defined in terms of the test basis, the test coverage, the test quality, the test risk, the test cost, the test time, etc. Test objectives should be specific, measurable, achievable, relevant, and time-bound, and they should be aligned with the project objectives and the quality characteristics. In uniform software development models, the test objectives may be the same for all test levels, as the testing process is repeated for each cycle or iteration, with similar focus, scope, and perspective of testing. However, this is not a good testing practice to be applied regardless of the chosen software development model, as it may not be appropriate, realistic, or effective for testing in some contexts or situations, such as when the software development and testing activities are performed in a hierarchical and modular manner, with different phases, deliverables, and dependencies, as in sequential software development models, such as the waterfall model, the V-model, or the W-model, when the test objectives vary according to the test levels, such as component testing, integration testing, system testing, and acceptance testing, or when the test objectives change according to the feedback, the learning, or the adaptation of the testing process, as in agile software development models, such as Scrum, Kanban, or XP, etc. Reference: ISTQB Certified Tester Foundation Level (CTFL) v4.0 sources and documents:
ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 1.1.1, Testing and the Software Development Lifecycle1 ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 1.2.1, Testing Principles1 ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 1.2.2, Testing Policies, Strategies, and Test Approaches1 ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 1.3.1, Testing in Software Development Lifecycles1 ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.1, Test Planning1 ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.2, Test Monitoring and Control1 ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.3, Test Analysis and Design1 ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.4, Test Implementation1 ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.5, Test Execution1 ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.6, Test Closure1 ISTQB® Glossary of Testing Terms v4.0, Work Product Review, Static Testing, Early Testing, Test-driven Development, Test Level, Entry Criterion, Exit Criterion, Test Objective, Test Basis, Test Coverage, Test Quality, Test Risk, Test Cost, Test Time2
NEW QUESTION # 28
Which of the following statements is true?
- A. The primary goal of experience-based test techniques is to design test cases that can be easily automated using a GUI-based test automation tool
- B. Some of the most common test basis used by white-box test techniques include user stories, use cases and business processes
- C. Experience-based test techniques are often useful to detect hidden defects that have not been targeted by black-box test techniques
- D. Experience-based test techniques rely on the experience of testers to identify the root causes of defects found by black-box test techniques
Answer: C
Explanation:
Explanation
Experience-based test techniques are test design techniques that rely on the experience, knowledge, intuition, and creativity of the testers to identify and execute test cases that are likely to find defects in the software system. Experience-based test techniques are often useful to detect hidden defects that have not been targeted by black-box test techniques, which are test design techniques that use the external behavior and specifications of the software system as the test basis, without considering its internal structure or implementation.
Experience-based test techniques can complement black-box test techniques by covering aspects that are not explicitly specified, such as usability, security, reliability, performance, etc. The other statements are false, because:
Experience-based test techniques do not rely on the experience of testers to identify the root causes of defects found by black-box test techniques, but rather to identify the potential sources of defects based on their own insights, heuristics, or exploratory testing. The root causes of defects are usually identified by debugging or root cause analysis, which are activities that involve examining the code or the development process to find and fix the errors that led to the defects.
Some of the most common test basis used by white-box test techniques include the source code, the design documents, the architecture diagrams, and the control flow graphs of the software system.
White-box test techniques are test design techniques that use the internal structure and implementation of the software system as the test basis, and aim to achieve a certain level of test coverage based on the code elements, such as statements, branches, paths, etc. User stories, use cases, and business processes are examples of test basis used by black-box test techniques, as they describe the functional and non-functional requirements of the software system from the perspective of the users or the stakeholders.
The primary goal of experience-based test techniques is not to design test cases that can be easily automated using a GUI-based test automation tool, but rather to design test cases that can reveal defects that are not easily detected by other test techniques, such as boundary value analysis, equivalence partitioning, state transition testing, etc. Test automation is the use of software tools to execute test cases and compare actual results with expected results, without human intervention. Test automation can be applied to different types of test techniques, depending on the test objectives, the test levels, the test tools, and the test resources. However, test automation is not always feasible or beneficial, especially for test cases that require human judgment, creativity, or exploration, such as those designed by experience-based test techniques. References: ISTQB Certified Tester Foundation Level (CTFL) v4.0 sources and documents:
ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 2.2.1, Black-box Test Design Techniques ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 2.2.2, White-box Test Design Techniques ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 2.2.3, Experience-based Test Design Techniques ISTQB Glossary of Testing Terms v4.0, Experience-based Test Technique, Black-box Test Technique, White-box Test Technique, Test Basis, Test Coverage, Test Automation
NEW QUESTION # 29
You are testing a room upgrade system for a hotel. The system accepts three differed types of room (increasing order of luxury): Platinum. Silver and Gold Luxury. ONLY a Preferred Guest Card holder s eligible for an upgrade.
Below you can find the decision table defining the upgrade eligibility:
What is the expected result for each of the following test cases?
Customer A: Preference Guest Card holder, holding a Silver room
Customer B: Non Preferred Guest Card holder, holding a Platinum room
- A. Customer A: doesn't offer any upgrade; Customer B: doesn't offer any upgrade.
- B. Customer A: offers upgrade to Silver room; Customer B: offers upgrade to Silver room.
- C. Customer A; doesn't offer any upgrade; Customer B: offers upgrade to Gold luxury room
- D. Customer A: offers upgrade to Gold Luxury room; Customer B: doesn't offer any upgrade
Answer: D
Explanation:
According to the decision table in the image, a Preferred Guest Card holder with a Silver room is eligible for an upgrade to Gold Luxury (YES), while a non-Preferred Guest Card holder, regardless of room type, is not eligible for any upgrade (NO). Therefore, Customer A (a Preferred Guest Card holder with a Silver room) would be offered an upgrade to Gold Luxury, and Customer B (a non-Preferred Guest Card holder with a Platinum room) would not be offered any upgrade. Reference = The answer is derived directly from the decision table provided in the image; specific ISTQB Certified Tester Foundation Level (CTFL) v4.0 documents are not referenced.
NEW QUESTION # 30
Which of the following statements about branch coverage is true?
- A. If full branch coverage has been achieved, then all unconditional branches within the code have surely been exercised
- B. If full branch coverage has been achieved, then all combinations of conditions in a decision table have surely been exercised
- C. The minimum number of test cases needed to achieve full branch coverage, is usually lower than that needed to achieve full statement coverage
- D. Exercising at least one of the decision outcomes for all decisions within the code, ensures achieving full branch coverage
Answer: D
Explanation:
Explanation
Exercising at least one of the decision outcomes for all decisions within the code, ensures achieving full branch coverage, which is a test coverage criterion that requires that all branches in the control flow of the code are executed at least once by the test cases. A branch is a basic block of code that has a single entry point and a single exit point, and a decision is a point in the code where the control flow can take more than one direction, such as an if-then-else statement, a switch-case statement, a loop statement, etc. The decision outcomes are the possible paths that can be taken from a decision, such as the then branch or the else branch, the case branch or the default branch, the loop body or the loop exit, etc. The other statements are false, because:
The minimum number of test cases needed to achieve full branch coverage, is usually higher than that needed to achieve full statement coverage, which is a test coverage criterion that requires that all executable statements in the code are executed at least once by the test cases. This is because branch coverage is a stronger criterion than statement coverage, as it implies statement coverage, but not vice versa. For example, a single test case can achieve full statement coverage for an if-then-else statement, but two test cases are needed to achieve full branch coverage, as both the then branch and the else branch need to be exercised.
If full branch coverage has been achieved, then all unconditional branches within the code have not necessarily been exercised, as unconditional branches are branches that do not depend on any decision, and are always executed, such as a goto statement, a break statement, a return statement, etc.
Unconditional branches are not part of the branch coverage criterion, as they do not represent different paths in the control flow of the code. However, they are part of the statement coverage criterion, as they are executable statements in the code.
If full branch coverage has been achieved, then all combinations of conditions in a decision table have not necessarily been exercised, as a decision table is a test design technique that represents the logical relationships between multiple conditions and their corresponding actions, in a tabular format. A decision table can have more combinations of conditions than the number of decisionoutcomes in the code, as each condition can have two or more possible values, such as true or false, yes or no, etc. For example, a decision table with four conditions can have 16 combinations of conditions, but the corresponding code may have only two decision outcomes, such as pass or fail. To exercise all combinations of conditions in a decision table, a stronger test coverage criterion is needed, such as condition combination coverage, which requires that all possible combinations of condition outcomes in the code are executed at least once by the test cases. References: ISTQB Certified Tester Foundation Level (CTFL) v4.0 sources and documents:
ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 2.3.1, Test Coverage Criteria Based on the Structure of the Software ISTQB Glossary of Testing Terms v4.0, Branch Coverage, Statement Coverage, Branch, Decision, Decision Outcome, Unconditional Branch, Decision Table, Condition Combination Coverage
NEW QUESTION # 31
The whole-team approach:
- A. is mostly adopted in projects aimed at developing safety-critical systems, as it ensures the highest level of testing independence
- B. is a consensus-based approach that engages the whole team in estimating the user stories
- C. promotes the idea that all team members should have a thorough understanding of test techniques
- D. promotes the idea that all team members should be responsible for the quality of the product
Answer: D
Explanation:
Explanation
This answer is correct because the whole-team approach is a way of working in agile projects where all team members share the responsibility for the quality of the product, and collaborate on delivering value to the customer. The whole-team approach involves testers, developers, business analysts, product owners, and other stakeholders in planning, designing, developing, testing, and delivering the product. The whole-team approach fosters communication, feedback, learning, and continuous improvement within the team. References: ISTQB Glossary of Testing Terms v4.0, ISTQB Foundation Level Syllabus v4.0, Section 3.1.1.1
NEW QUESTION # 32
Consider a review for a high-level architectural document written by a software architect. The architect does most of the review preparation work, including distributing the document to reviewers before the review meeting. However, reviewers are not required to analyze the document in advance, and during the review meeting the software architect explains the document step by step. The only goal of this review is to establish a common understanding of the software architecture that will be used in a software development project.
Which of the following review types does this review refer to?
- A. Audit
- B. Informal review
- C. Walkthrough
- D. Inspection
Answer: C
Explanation:
Explanation
This answer is correct because a walkthrough is a type of review where the author of the work product leads the review process and explains the work product to the reviewers. The reviewers are not required to prepare for the review in advance, and the main objective of the walkthrough is to establish a common understanding of the work product and to identify any major defects or issues. A walkthrough is usually informal and does not follow a defined process or roles. In this case, the review for a high-level architectural document written by a software architect matches the characteristics of a walkthrough. References: ISTQB Glossary of Testing Terms v4.0, ISTQB Foundation Level Syllabus v4.0, Section 2.4.2.2
NEW QUESTION # 33
Test automation allows you to:
- A. demonstrate the absence of defects
- B. avoid performing exploratory testing
- C. produce tests that are less subject to human errors
- D. increase test process efficiency by facilitating management of defects
Answer: C
Explanation:
Test automation allows you to produce tests that are less subject to human errors, as they can execute predefined test scripts or test cases with consistent inputs, outputs, and expected results. Test automation can also reduce the manual effort and time required to execute repetitive or tedious tests, such as regression tests, performance tests, or data-driven tests. Test automation does not demonstrate the absence of defects, as it can only verify the expected behavior of the system under test, not the unexpected or unknown behavior. Test automation does not avoid performing exploratory testing, as exploratory testing is a valuable technique to discover new information, risks, or defects that are not covered by automated tests. Test automation does not increase test process efficiency by facilitating management of defects, as defect management is a separate activity that involves reporting, tracking, analyzing, and resolving defects, which may or may not be related to automated tests. Reference: ISTQB Certified Tester Foundation Level (CTFL) v4.0 sources and documents:
ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 3.3.1, Test Automation1 ISTQB® Glossary of Testing Terms v4.0, Test Automation2
NEW QUESTION # 34
......
CTFL_Syll_4.0 PDF Dumps Are Helpful To produce Your Dreams Correct QA's: https://simplilearn.lead1pass.com/ISQI/CTFL_Syll_4.0-practice-exam-dumps.html