
2023 Valid C-IBP-2302 Exam Updates - 2023 Study Guide
C-IBP-2302 Certification - The Ultimate Guide [Updated 2023]
NEW QUESTION # 22
What are the outputs of the Calculate Target Inventory Components Operator?Note: There are 3 correct answers to this question.
- A. Target Cycle Stock
- B. Recommended Safety Stock
- C. Component Usage
- D. Target Pipeline Stock
- E. Reorder Point
Answer: A,B,D
NEW QUESTION # 23
You are developing the functionality and appearance of the Excel UI for SAP IBP business users.Which extensibility capabilities for SAP IBP, add-in for Microsoft Excel are provided by Custom VBA coding?Note: There are 2 correct answers to this question.
- A. Changing the layout of the master data workbooks
- B. SAP IBP ribbon extension
- C. Changing the entries from the Name Manager
- D. Changing the member names
Answer: A,B
NEW QUESTION # 24
Model configuration allows the attributes of a master data type to be assigned as key figures.Which features are relevant for this type of object?
- A. This object is not exposed to the user in planning views or modeling.
- B. This object provides a single value for a unique planning combination.
- C. This type of key figure is not usually stored and it cannot be set to editable.
- D. This object contains user-defined criteria that monitor the running of business plans.
Answer: B
NEW QUESTION # 25
Forecast Error CV is an input to which of the following?
- A. Time-Series-Based Supply Planning Optimizer
- B. Multistage Inventory Optimization in Inventory Planning Profile Operator
- C. Calculate Target Inventory Components in Inventory Planning Profile Operator
- D. Forecast Error Calculation in Inventory Planning Profile Operator
Answer: B
NEW QUESTION # 26
What are the S&OP operator (optimizer) parameters associated with demand fair share?
- A. Number of fair share segments Additional tiering costs (default) Number of fair share segments late delivery
- B. Number of fair share segments Additional tiering costs (default) Inventory days of supply
- C. Number of fair share segments Maximum days of coverage Number of fair share segments late delivery
- D. Number of fair share segments Additional tiering costs (default) Maximum inventory
Answer: A
NEW QUESTION # 27
You are starting a new implementation project for SAP IBP and are considering the possible system architecture.What are the possible approaches for setting up the system landscape?Note: There are 2 correct answers to this question.
- A. Set up a three-tier landscape using transport, starting from the development system to test and production.
- B. Set up a two-tier landscape, and have the configuration of the development system regularly updated from the production system.
- C. Create additional planning areas in the test system to support training needs.
- D. Create additional test planning areas in the production system to support cutover needs.
Answer: A,B
NEW QUESTION # 28
Why would you set up a cascading filter in the planning view?Note: There are 2 correct answers to this question.
- A. To filter data in an Application Job template
- B. To filter attributes based on other attribute filters
- C. To filter attributes based on specific values
- D. To filter using attributes that have a large number of values
Answer: C,D
NEW QUESTION # 29
You want to display and edit data in different Units of Measure (UOM).Which of the following must you consider before you use the UOM?Note: There are 3 correct answers to this question.
- A. Analytics provide the user with the option to select the target unit of measure.
- B. Unit of measure is an attribute of a master data type, such as Product.
- C. Units of measure are usually not time-independent.
- D. Conversion to the target unit of measure is handled by SAP IBP Excel UI
- E. Units of measure are usually not time-dependent.
Answer: A,B,E
NEW QUESTION # 30
You created a key figure and want to add calculations.Which of the following rules do you consider?Note: There are 2 correct answers to this question.
- A. The calculation chain for a key figure must always result in a calculated key figure.
- B. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation level.
- C. Key figures can be calculated across different planning levels.
- D. All key figure calculations have calculation inputs, which can be marked as stored or calculated.
Answer: C,D
NEW QUESTION # 31
How can the SAP IBP scenario modeling functionality support business users in the S&OP planning cycle?Note: There are 2 correct answers to this question.
- A. Simulate demand sensing inputs for Supply Review
- B. Simulate statistical forecast at the Demand Review stage
- C. Model inventory turns based on Target Safety stocks
- D. Simulate heuristics run in Supply Review stage
Answer: B,D
NEW QUESTION # 32
What is a prerequisite for modeling outsourced manufacturers with production capacity using the Supply Optimizer?
- A. Model relative production costs across internal locations and outsourced manufacturing locations
- B. Use production lead times and offsets to manage components at the outsourced manufacturing location
- C. Model target inventory and stocks at the outsourced manufacturing location
- D. Ensure that the outsourced manufacturing locations have a separate subnetwork
Answer: A
NEW QUESTION # 33
The S&OP Operator Profiles app is used to configure different types of algorithms.Which algorithm-specific settings are unique for only the Time Series-based Supply Optimizer?Note: There are 2 correct answers to this question.
- A. Processing mode
- B. Global cost factors
- C. Time profile level
- D. Discretization
Answer: A,B
NEW QUESTION # 34
You are invited to review a problem with a customer's SAP IBP Excel template performance.What areas with the biggest potential performance impact would you focus on?Note: There are 2 correct answers to this question.
- A. Number of local members and complexity of calculations
- B. Excessive SAP IBP formatting in the Microsoft Excel UI
- C. Number of analytics charts displaying key figures' values
- D. Complex calculation graphs for key figures
Answer: B,D
NEW QUESTION # 35
Which of the following are examples of time-independent key figures?Note: There are 2 correct answers to this question.
- A. A unit of measure key figure, such as UOMCONVERSIONFACTOR
- B. A forecast metric key figure, such FCSTMAPE
- C. A special key figure marked as an aggregate key figure (aggregate constraint)
- D. A currency conversion key figure, such as exchange rate
Answer: A,C
NEW QUESTION # 36
Which of the following solutions are feasible when using the time series supply optimizer?Note: There are 3 correct answers to this question.
- A. Violation of minimum aggregated inventory values
- B. Violation of minimum resource utilization
- C. Not respecting production capacity
- D. Not-fully satisfied demands
- E. Not adhering to maximum transport values
Answer: A,B,D
NEW QUESTION # 37
......
C-IBP-2302 Practice Exam and Study Guides - Verified By Lead1Pass: https://simplilearn.lead1pass.com/SAP/C-IBP-2302-practice-exam-dumps.html