Get Microsoft MB-335 Dumps Questions [2026] To Gain Brilliant Result
MB-335 dumps - Lead1Pass - 100% Passing Guarantee
NEW QUESTION # 113
You need to create the new summer limited edition bicycle in Dynamics 365 in preparation for taking orders.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation:
Graphical user interface, text, application, email Description automatically generated
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/dimension-based-product-configuration
Topic 4, Case Study 4, Fabrikam inc.
Fabrikam, Inc. Is a discrete manufacturer of outdoor patio furniture. The company originated as a sole owner working from a home garage, then moved into a commercial storage space, and later into a full manufacturing facility. The company operates as two operating legal entities, one in the United States and the other in Mexico.
As the company grew, the existing software systems failed to grow with it. This meant that financial reporting was managed in an outdated accounting system; raw materials planning, production, and inventory control were managed in another system; and cost calculations were tracked in multiple spreadsheets managed by analysts.
Current environment
The Fabrikam. inc. engineering team uses a third-party computer-aided design (CAD) system for drawings.
These drawings are later introduced into one or more companies for sale. A customer service center handles complaint calls and places orders for distributors.
The current system landscape creates a lack of controls and visibility across the systems, leading to overages of some raw materials, shortages on others, and large quantities of scrap. Heavy production volume provides little to no room for system downtime. The staff manually creates production orders, which leads to double work for system entry later. This delay has a ripple effect into the materials planning.
The company currently sources teakwood from India, making it a more expensive and high-end material.
Cedar and redwood are both sourced from the Western US. Truck driver shortages across the nation have caused shipping costs to rise sharply.
Fabrikam, Inc. recently decided to expand into the gas firepit market. All products are currently being prototyped. The company decides that the firepit prototype should be initially available only in the United States. The firepits will be manufactured only in Nevada and Arizona. The firepits are produced as prototyping: this production line operates only on Mondays.
Fabrikam, Inc. has purchased new manufacturing equipment for the firepit metal fabrication. This purchase includes a warranty, which requires that the company perform routine maintenance. Fabrikam, inc. elects to complete the maintenance in house on a quarterly schedule and maintain appropriate records for warranty purposes. The metal fabrication equipment consists of three separate machines used in a single production process.
Fabrikam. Inc. made the decision to move to Dynamics 365 Supply Chain Management.
Application and environment
* Fabrikam, inc. must move systems and processing to software as a service (SaaS) whenever possible because the company does not have enough IT staff to support hardware.
Inventory and costing
* Finished goods fall into three categories:
* Wood furniture (teak, cedar, redwood) o Outdoor heating (firepits. gas heaters)
* Each outdoor heating item with slight variations, such as a chrome or steel finish, must have a unique item number, o Repair parts (nuts and bolts, ignitors. and other parts)
* The system must account for the fact that Fabrikam. inc. must take legal ownership of teakwood at the time of shipment, not at the time of receipt into the warehouse.
* The company must accrue for the costs of the teakwood materials as soon as the company takes ownership.
The company takes ownership at the time of shipment, which is posted prior to physical receipt at the warehouse.
Engineering
* Engineers who specialize in gas consumer goods will design the firepits and ate the only users with authority to release the products for sale.
* Engineering must notify customer service of any open orders that may contain a released product version that may be discontinued or delayed.
* The change request workflow must route to the engineer.
Production
* The raw material and subcomponent goods for the firepit must be managed by the engineer. This means the engineer must oversee any new items, material changes, address problems, and so on.
* The metal fabrication equipment must be tracked at the locations where the firepits are produced.
* The production team must operate on an all-day/everyday model, with each team operating in a 12-hour shift. This is a recent change to keep up with high demand for products, as well as for planning a new product line.
* Raw material and subcomponent items for the firepit prototype must not be available for use until engineering is ready for the prototype product release.
* Due to the production staff schedule, all equipment must be planned according to the staffing.
* Maintenance for each of the three pieces of machinery must be scheduled at the same time so that only the local maintenance technician works on the equipment.
* When the firepits are ready for the test market they must made be available for sale.
* The United States operating company must review any engineering products before they are available for sales or production orders,
* The engineering team must release the engineering product into the United States operating company,
* The engineering BOM lines must not be removed by the United States operating company.
Application and environment
* The operations manager is concerned that system downtime is so frequent that It is impacting efficiency due to the all-day/everyday production operation model.
Inventory and costing
* Fabrikam, inc. marketing campaigns in the desert states of Arizona- Nevada, and New Mexico have led to an increased demand for teakwood furniture to endure weather elements. Supply and demand for this wood lowered expected margins with increased shipping costs and price increases from the vendors.
* User1 reports that the inventory value of the teakwood is not on the financial reports, even though ownership of the product begins at the port of shipment,
* Upon receipt into the physical warehouse, User2 reports that the warehouse workers received less teakwood than the ordered amount on the purchase order.
Engineering and production
* As the firepits are produced and feedback received from the test market, records must be maintained of each revision to the firepit design.
* Firepits must have attributes associated with them to specify the type of gas line that is available for the firepit such as natural gas or propane.
* Customer service is receiving calls that the firepit ignition switch does not always work as expected. This issue was reported through an engineering change request.
* User3 reports resource issues on the production shop floor due to system maintenance issues and other delays. The company does not want User3 or the other workers to stop production.
* User4 reports that a bolt needed for cedar wood furniture is out of stock. A temporary substitution bolt was identified prior to starting the production order.
* User5 reports that a hinge for redwood furniture will be discontinued at the end of the year. Production must reflect an updated part.
* A large order was placed for 1,500 pieces of teakwood furniture and production orders must start as soon as possible.
* Users reports the following:
* Only 100 pieces of furniture can be produced on the night shift due to resourcing. Enough raw materials are on hand to complete 100 pieces, but not enough to produce all 1.500 pieces.
* The production floor is organized into dedicated production lines, each with their own warehouse. The warehouse workers must pick the raw materials to the correct warehouse location.
NEW QUESTION # 114
You need to configure scheduling for each production area.
Which scheduling options should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION # 115
You need to resolve the issue for UserG.
What should you do? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation:
NEW QUESTION # 116
You need to set up the system to calculate the overhead rates automatically for production.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation:
A screenshot of a computer Description automatically generated
Topic 1, CASE STUDY 1 Manufacturing Company
General information
A manufacturing company produces custom configured-to-order motorcycles. The company plans to implement Dynamics 365 Supply Chain Management. The company contains one legal entity located in Missouri where all production and warehousing operations occur.
Customization options
The custom motorcycles have a variety of selections that can be selected in the listed order by the end customer, including the following:
Customization restrictions
The following restrictions on customizations are in place:
* Green color can only be sold with the Legend Trim.
* Orange color can be sold with the Sport or Legend Trim.
* The ML seat must be included in the Legend package.
* The MS seat must be included in the Sport package.
Manufacturing facilities
The company includes the following manufacturing groups: Assembly and Plastic Molding. The Assembly group is responsible for assembling the motorcycles with purchased and manufactured goods. The Plastic Molding group is responsible for manufacture of all plastic parts used in the assembly area.
Motorcycle manufacturing
The parts for the product assembly are picked from the warehouse and staged at the correct workstation by a warehouse operator for each production order.
Plastic manufacturing
Plastic parts are molded using dyes that create multiple parts at once. The parts are machined in the same production process to remove excess plastic and add additional holes for assembly. Excess plastic is recycled back into the feedstock of the same color plastic chips for use in the molding process.
Metal Parts
Raw metal parts are purchased fully machined but without primer or paint. The parts are subcontracted to a vendor for primer and paint based upon the color requirements.
Facility
The company has a single warehouse that supports both the assembly and plastic manufacturing areas. The warehouse consists of three aisles with 15 bins and three shelves. The facility has no Wi-Fi capacity but has hardwired terminal stations throughout the assembly production line.
Transactions are currently completed by office staff. Raw materials transfer must support capacity constraints for paint and primer.
Requirements
The company has a single warehouse that supports both the assembly and plastic manufacturing areas. The warehouse consists of three aisles with 15 bins and three shelves. The facility has no Wi-Fi capacity but has hardwired terminal stations throughout the assembly production line.
Transactions are currently completed by office staff. Raw materials transfer must support capacity constraints for paint and primer.
Sales Order
The company has the following requirements for sales orders:
* During the configuration of a sales order, invalid combinations must be prevented.
* Each configuration must create a unique bill of material (BOM) and Route based on options selected.
* Sales pricing for the sales order must be based upon options selected.
* Due to emissions regulations, the motorcycles cannot be sold to the state of California.
Motorcycle manufacturing
The company has the following requirements for motorcycle manufacturing:
* Schedule labor only at the labor pool level without machines by day
* Produce motorcycles within a scheduled day in any order.
* Record actual production labor with start/stop times.
* Record manager approval of labor entered prior to posting.
* Post actual material consumption after production is finished.
Plastic manufacture
The company has the following requirements for motorcycle manufacturing:
* Schedule both labor and machines.
* Adjust schedules by using a Gantt chart.
* Backflush standard labor by operation.
* Post actual material consumption at the start of production.
* Track and allocate costs to the excess plastic.
* Report multiple molded part numbers during the same production run.
* Determine the correct mold to use on a production order.
* Generate a batch number for each production order.
Metal Parts
The company has the following requirements for metal parts manufacturing:
* Schedule shipments to the vendor for painting.
* Receive painted parts into inventory from the vendor.
* Track vendor inventory levels.
Default
You must configure defaults for manufacturing execution production orders to meet the following requirements:
* Ensure accuracy for production order pick list posting.
* Ensure correct pick list creation.
Issues
A. In the current system, the company cannot calculate overhead rates and determine the breakdown of material, labor, machine, and overhead costs for production.
B. The company is manually calculating an 8% overhead on materials and posting a journal manually.
NEW QUESTION # 117
You need to configure scheduling for each production area.
Which scheduling options should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION # 118
You need to modify the production order defaults for the manufacturing execution production order Start process.
What should you do? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation:
NEW QUESTION # 119
A company is implementing Dynamics 365 Supply Chain Management. Items are grouped into finished goods, service, raw-metal, and taw-other.
The production manager reports an issue with steel shortages stopping production and must ensure all steel is reserved against production orders when they are scheduled. All other items are reserved when production orders are started.
You need to configure the reservations for production orders.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation:
NEW QUESTION # 120
You need to configure the production requirements for the QA team. What should you configure?
- A. quarantine order
- B. product readiness policies
- C. quality order
- D. inventory status
Answer: C
NEW QUESTION # 121
You need to create production orders for the new summer limited-edition bicycles.
How should they be created? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION # 122
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 Supply Chain Management and configures the system to support process manufacturing.
The company manufactures pain-relieving lotions. Several of the primary ingredients are delivered at different concentrations depending on the ingredient and vendor. IngredientA is the primary active ingredient in the lotion. IngredientB is used as a compensating ingredient You need to ensure that the system is set up to support the manufacturing process.
Solution: Set up the IngredientB formula line as a phantom BOM.
Does the solution meet the goal?
- A. No
- B. Yes
Answer: A
NEW QUESTION # 123
You need to resolve the issue for UserC.
Which two options should you configure? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
- A. Shelf life period in days
- B. Forward tracing
- C. Best advice period in days
- D. Best before period in days
- E. Backward tracing
Answer: A,D
NEW QUESTION # 124
You are using the manufacturing execution module in Dynamics 365 Supply Chain Management. License plate labels must be printed for products in the Report as finished step. You need to use the manufacturing execution functionality that meets this requirement. What should you use?
- A. Operations schedules
- B. Production waves
- C. License plates
- D. Job card device
Answer: C
Explanation:
Explanation
The manufacturing execution functionality that meets the requirement of printing license plate labels for products in the Report as finished step is License plates are unique identifiers that are assigned to containers, pallets, or individual items in inventory. License plates can be used to track and manage inventory throughout the warehouse processes, such as receiving, put away, picking, packing, and shipping1. License plates can also be used in production processes, such as reporting as finished and raw material picking2.
To print license plate labels for products in the Report as finished step, you must enable the Generate license plate option on the mobile device menu item that is used for reporting as finished2. You must also set up a document routing layout and a document routing for license plate labels3. When you use the mobile device to report a production order as finished, the system will generate a license plate for the finished product and print a license plate label to the specified printer2. The license plate label can include information such as the item number, batch number, quantity, and barcode of the finished product3.
1: License plates 2: Enable license plate label printing 3: Document routing label layouts
NEW QUESTION # 125
An automobile manufacturer leases cars to companies for use as company cars.
A car leased to a company breaks down and requires repairs.
You must open a maintenance request and replace the car with an equivalent model until the original car is repaired and returned to the company. When the manufacture' receives and inspects the car, the replacement car can be released to the company.
You need to select the maintenance request components to use.
Which components should you use? To answer, drag the appropriate components to the correct assets. Each component may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
Note: Each correct selection is worth one point.
Answer:
Explanation:
Explanation:
To select the maintenance request components to use, you should use the following:
* The leased car that must be repaired: You should use the Inbound asset component. An inbound asset is an asset that is received from a customer or vendor for maintenance or repair1. You can use the Inbound assets page to create and manage inbound assets in Asset Management2. You can also create a maintenance request for an inbound asset and link it to a work order3.
* The replacement car for the leased car: You should use the Outbound asset component. An outbound asset is an asset that is sent to a customer or vendor as a temporary replacement for an asset that is being maintained or repaired1. You can use the Outbound assets page to create and manage outbound assets in Asset Management. You can also link an outbound asset to an inbound asset or a work order.
1: Inbound and outbound assets 2: Inbound assets 3: Create a maintenance request for an inbound asset :
[Outbound assets]
NEW QUESTION # 126
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 Supply Chain Management and configures the system to support process manufacturing.
The company manufactures pain-relieving lotions. Several of the primary ingredients are delivered at different concentrations depending on the ingredient and vendor ingredient A is the primary active ingredient in the lotion. IngredientB is used as a compensating ingredient.
You need to ensure that the system is set up to support the manufacturing process.
Solution: Create a dimension-based product master with variants and use the trade agreements to specify the different pricing.
Does the solution meet the goal?
- A. No
- B. Yes
Answer: A
Explanation:
The solution does not meet the goal. Here is the explanation:
To ensure that the system is set up to support the process manufacturing of pain-relieving lotions, you should use the following steps1:
Create a product master for the lotion and release it to the relevant legal entities. On the Product dimension groups page, select Constraint-based configuration as the configuration technology, and select the configuration dimension. On the Released product details page, select Configurable on the Engineer tab.
Create a constraint-based product configuration model for the lotion and add it as a version to the product master. On the Constraint-based product configuration model details page, add attributes, constraints, subcomponents, BOM lines, and route operations to define the features and structure of the lotion. For example, you can add an attribute for ingredient A and specify its concentration as a value. You can also add constraints to limit the combinations of attribute values that are allowed.
Create a price model for the lotion and link it to the product configuration model. On the Price models page, add price components and specify how they are calculated based on attributes, subcomponents, BOM lines, or route operations. For example, you can add a price component for ingredient A and specify different prices for different concentrations.
Configure products on sales orders, sales quotations, purchase orders, or production orders by using the Product configuration models page. You can select values for attributes and see how they affect the price of the lotion. You can also view the price details and see how each price component contributes to the total price.
The solution in the question is not correct, because it does not involve constraint-based product configuration or price models. Creating a dimension-based product master with variants and using trade agreements to specify different pricing would not allow you to handle different concentrations of ingredients or calculate prices based on attributes.
1: Product configuration overview : Create constraint-based configuration : Price models
NEW QUESTION # 127
An automobile manufacturer leases cars to companies for use as company cars.
A car leased to a company breaks down and requires repairs.
You must open a maintenance request and replace the car with an equivalent model until the original car is repaired and returned to the company. When the manufacture' receives and inspects the car, the replacement car can be released to the company.
You need to select the maintenance request components to use.
Which components should you use? To answer, drag the appropriate components to the correct assets. Each component may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
Note: Each correct selection is worth one point.
Answer:
Explanation:
Explanation:
To select the maintenance request components to use, you should use the following:
* The leased car that must be repaired: You should use the Inbound asset component. An inbound asset is an asset that is received from a customer or vendor for maintenance or repair1. You can use the Inbound assets page to create and manage inbound assets in Asset Management2. You can also create a maintenance request for an inbound asset and link it to a work order3.
* The replacement car for the leased car: You should use the Outbound asset component. An outbound asset is an asset that is sent to a customer or vendor as a temporary replacement for an asset that is being maintained or repaired1. You can use the Outbound assets page to create and manage outbound assets in Asset Management. You can also link an outbound asset to an inbound asset or a work order.
1: Inbound and outbound assets 2: Inbound assets 3: Create a maintenance request for an inbound asset :
[Outbound assets]
NEW QUESTION # 128
A company uses Dynamics 365 Supply Chain Management for its rebate management process.
The company must be able to generate calculated rebates for a deal that requires specific configurations. The calculated rebate configuration must account for the order in which purchases are calculated and include the following details:
* Document notes = Prenotes not yet calculated
* Include credit notes = Yes
* Vendor rebate basis = Purchase order
* Price basis = FIFO
* Calculation method = Rolling
* Paid invoices only = No
You need to run the very first process to ensure generation of the correct rebates. Which batch process should you run?
- A. Create prenotes
- B. Rebate management
- C. Cost calculation details
- D. Reimbursement
- E. Calculate FIFO purchase price
Answer: A
NEW QUESTION # 129
A company uses multiple Dynamics 365 applications to track and repair equipment.
The company wants to improve its repair order process. Repair technicians frequently encounter unexpected issues daily. The technicians must be empowered to address the issues and create new work orders by doing the following:
* Provide step-by-step, just-in-time training for work order completion in the field by using videos and text.
* Document work order creation in a single, printable document.
* Report on the use of hands-on training.
You need to implement a solution forth requirements.
Which solution should you implement for each requirement? To answer, drag the appropriate solutions to the correct requirements. Each solution may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
Answer:
Explanation:
Explanation:
To implement a solution for the requirements, you should use the following solutions:
* Just-in-time training: You should use Dynamics 365 Guides. This solution allows you to create interactive, step-by-step learning experiences for repair technicians in the field. You can use videos, images, and text to provide instructions and tips for work order completion. You can also use mixed reality tools to overlay holograms on physical objects and guide technicians through complex tasks.
* Work order creation document: You should use Dynamics 365 Supply Chain Management. This solution allows you to create and manage work orders for equipment maintenance and repair. You can use the Work order page to enter the details of the work order, such as the customer, the equipment, the service tasks, the materials, and the costs. You can also print a work order report that summarizes the information in a single document.
* Training reporting: You should use Dynamics 365 Guides. This solution allows you to track and analyze the usage and effectiveness of your guides. You can use Power BI dashboards to view metrics such as completion rates, duration, errors, and feedback for each guide and step. You can also filter the data by date, location, operator, or device.
[What is Dynamics 365 Guides?] : [Work orders overview] : [Print a work order report] : [Analyze guide effectiveness]
NEW QUESTION # 130
......
Get 100% Passing Success With True MB-335 Exam: https://simplilearn.lead1pass.com/Microsoft/MB-335-practice-exam-dumps.html